Al Maktoum International Airport Guide 2026: Dubai’s Future Aviation Mega-Hub
Al Maktoum International Airport (DWC) is Dubai’s second airport, located in Dubai South near Jebel Ali, about 40–45 km southwest of Downtown Dubai. It currently handles low-cost carriers, seasonal charters, and Emirates SkyCargo, while a $35 billion (AED 128 billion) expansion is under construction to make it the world’s largest airport, with Phase 1 opening in 2032 and eventual capacity for 260 million passengers a year.

Dubai is building the airport that will eventually replace Dubai International Airport (DXB) as the emirate’s primary aviation gateway, and its name is Al Maktoum International Airport. Also known as Dubai World Central (DWC), this airport already plays an important role today as home to budget carriers, charter flights, and one of the world’s busiest cargo operations. But its real significance lies ahead: a $35 billion expansion now under construction is set to transform DWC into a five-runway, 260-million-passenger mega-hub by the early 2030s.
Whether you are flying through DWC on a budget airline today, tracking Dubai’s biggest infrastructure project, or planning around the eventual move of Emirates and flydubai, this guide covers everything you need to know about Al Maktoum International Airport in 2026 – its current operations, the expansion timeline, transport links, and what the future holds for air travel in Dubai.
What Is Al Maktoum International Airport?

Al Maktoum International Airport carries the IATA code DWC and ICAO code OMDW. It sits within Dubai South, a planned residential, logistics, and commercial city in the Jebel Ali area, roughly 37–45 kilometres southwest of Downtown Dubai and the Burj Khalifa. The airport first opened in June 2010, initially focused on cargo operations before gradually adding scheduled passenger flights.
Today, Dubai Airports – the same government body that operates DXB – manages Al Maktoum International as Dubai’s secondary airport. It also serves as the dedicated hub for Emirates SkyCargo, making it one of the busiest freight airports in the Middle East, even though passenger numbers remain modest compared with DXB.
DWC vs DXB: Understanding the Two Dubai Airports
Visitors often confuse Dubai’s two airports, so a side-by-side comparison helps clarify the current relationship between them.
| Feature | Al Maktoum International (DWC) | Dubai International (DXB) |
|---|---|---|
| Location | Jebel Ali / Dubai South | Garhoud, central Dubai |
| Distance from Downtown Dubai | ~40–50 km | ~5 km |
| Current role | Secondary airport, cargo hub, budget carriers | Primary international hub |
| Main airlines today | Wizz Air, seasonal flydubai, European and Russian charter carriers | Emirates, flydubai (main base), 100+ airlines |
| Terminals | 1 passenger terminal (current) | 3 terminals |
| Future role | Planned to become Dubai’s sole major airport by early 2030s | Operations to gradually transfer to DWC |
| Atmosphere | Quiet, modern, low-traffic | Busy global hub |
This table matters for search intent because many travellers researching “Al Maktoum International Airport” actually want to know whether they are flying into the right airport, how far it is from their hotel, and when Emirates flights will move there. The sections below answer each of these directly.
Current Operations at DWC in 2026
As of 2026, Al Maktoum International functions as a single-terminal airport primarily serving low-cost and charter traffic. It is best understood as Dubai’s “budget and cargo airport” while the main expansion is under construction.
Passenger airlines operating scheduled or seasonal routes from DWC include Wizz Air, along with a rotating list of European and Russian charter and leisure carriers such as Aeroflot, Azimuth, Eurowings, Luxair, Neos, Norwegian Air Sweden, Red Wings, S7 Airlines, SAS, SmartWings, Transavia, Ural Airlines, and UTair. flydubai also operates selected seasonal routes from the airport. Popular destination markets include Russia, Central and Eastern Europe, and Scandinavia, with Moscow among the most frequently served routes.
Cargo operations are a defining feature of DWC. As the base for Emirates SkyCargo, the airport handles a significant share of Dubai’s air freight volume, supporting the emirate’s position as a global logistics and trade hub.
Terminal experience at DWC is noticeably calmer than DXB. The current facility offers free Wi-Fi, a Dubai Duty Free store, a small selection of dining options including familiar international brands, a Marhaba lounge for Priority Pass holders, car rental counters from major international brands, and around 800 parking bays directly in front of the terminal.
On-time performance at DWC has historically hovered in the low-to-mid 70% range for on-schedule departures, comparable to many secondary international airports.
The $35 Billion Al Maktoum Airport Expansion
The single biggest reason Al Maktoum International Airport is generating headlines in 2026 is its expansion project – one of the largest airport developments anywhere in the world.
Background and Approval
Dubai has run cargo, general aviation, and limited passenger services from DWC for years, but the scale changed dramatically in April 2024, when Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, approved a new passenger terminal project with a total cost of $35 billion (AED 128 billion). This positioned Al Maktoum International as the centrepiece of Dubai’s long-term aviation strategy and a pillar of the Dubai Economic Agenda D33.
Planned Capacity and Infrastructure
Once complete, Al Maktoum International Airport is designed to be the largest airport in the world by capacity, featuring:
- 260+ million passengers annually at full build-out
- 12 million tonnes of annual air cargo capacity
- Five parallel runways
- Two passenger terminals
- Seven concourses
- 430 aircraft stands
The centrepiece of Phase 1 is the West Terminal, a seven-level building covering 800,000 square metres, designed to process 45 million passengers a year on its own – roughly comparable in scale to a major hub airport today.
Construction Progress as of Mid-2026
Dubai officials have confirmed the project remains on schedule. Key milestones reported in June 2026 include:
- More than AED 13 billion ($3.5 billion) in contracts currently under execution
- Over 10 million work hours completed in the preceding 15 months
- An additional AED 55 billion ($15 billion) in strategic contracts expected to be awarded before the end of 2026, covering major terminal and concourse packages
- More than 17,000 concrete piles completed
- Over 45 million cubic metres of excavation carried out
- The airport’s second runway completed
- Structural foundation work underway for passenger terminals and gates
Sheikh Hamdan bin Mohammed bin Rashid Al Maktoum, Crown Prince of Dubai, has publicly reaffirmed that the project is proceeding according to its approved timeline. Sheikh Ahmed bin Saeed Al Maktoum, Chairman of Dubai Airports and Chairman and CEO of Emirates Airline and Group, has also described the project as central to Dubai’s long-term economic vision.
Automated People Mover System
A 14-station automated people mover network will connect terminals, concourses, and transport hubs across the airport. Four stations are included in Phase 1. Dubai selected a consortium of L&T and Mitsubishi to deliver this underground transit system, which will be essential for moving passengers efficiently across a facility of this scale.
Emirates’ Investment
In November 2025, Sheikh Ahmed bin Saeed Al Maktoum announced that Emirates would invest between $10 billion and $12 billion into Al Maktoum International Airport, funded through a mix of cash reserves and new debt. This is a strong signal that Dubai’s flagship carrier is preparing for its eventual relocation from DXB.
Timeline: When Will Al Maktoum International Airport Open?
One of the most searched questions about DWC concerns dates. Here is the clearest picture based on official statements through mid-2026:
| Milestone | Status / Date |
|---|---|
| Original DWC cargo operations | Opened June 2010 |
| New terminal project approved | April 2024 |
| Second runway completed | Confirmed by June 2026 |
| Phase 1 (West Terminal) construction | Ongoing through 2026, structural works underway |
| Major terminal contracts (AED 55 billion) | Expected to be awarded by end of 2026 |
| Phase 1 operations begin | 2032 (officially confirmed timeline) |
| Full build-out (5 runways, 260M passengers) | No confirmed date; long-term master plan |
It is worth noting that Al Maktoum International’s expansion has been delayed multiple times since it was first announced in the early 2010s, with earlier target dates of 2022 and 2025 having passed. The 2032 date represents the current officially reaffirmed timeline as of mid-2026, backed by visible construction progress, but readers planning long-term travel or investment decisions should treat future dates as subject to revision, as has happened previously with this project.
What Happens to Dubai International Airport (DXB)?
Dubai’s leadership has confirmed that Emirates and flydubai operations are expected to transfer to Al Maktoum International once it is ready, consolidating Dubai’s aviation activity at a single mega-hub. DXB, located in the built-up Garhoud area near central Dubai, has limited room for further physical expansion, which is one of the core reasons Dubai committed to building an entirely new hub at DWC rather than continuing to grow DXB.
For now, DXB remains fully operational as Dubai’s primary international gateway, and this will continue to be the case for years to come. The relocation of major carriers will happen only once DWC’s Phase 1 facilities are complete and operational, which is targeted for 2032.
Location, Distance, and How to Get to DWC
Al Maktoum International Airport sits within Dubai South, close to Jebel Ali, and is easily reached via three of Dubai’s major arterial roads:
- Sheikh Zayed Road (E11)
- Sheikh Mohammed Bin Zayed Road (E311)
- Emirates Road (E611)
By car or taxi: The drive from Downtown Dubai or Dubai Marina typically takes around 35–45 minutes depending on traffic, covering roughly 40–50 km.
By public transport: The nearest Dubai Metro station is Ibn Battuta Mall, on the Red Line. From there, RTA buses and taxis connect to the airport terminal. Public transport journeys from central Dubai currently take approximately 1 hour to 1 hour 20 minutes, making a taxi or ride-share the more practical option for most travellers.
Future rail connectivity: Dubai’s Roads and Transport Authority (RTA) has begun design work on a Route 2020 Metro extension linking the existing Expo 2020 station to the new Al Maktoum West Terminal. Plans are also being studied for a dedicated Airport Express Line connecting DXB and DWC directly, alongside deeper integration with the planned Etihad Rail national passenger network. These upgrades are intended to solve DWC’s current transport-access gap well before Phase 1 passenger operations begin.
Nearby landmarks and attractions: Because of its location in Dubai South, DWC sits relatively close to Expo City Dubai, Dubai Parks and Resorts (Legoland and Motiongate), and Jebel Ali Port, making it a convenient arrival point for visitors heading to those destinations.
Advantages and Disadvantages of Flying via DWC Today
Advantages:
- Significantly quieter and less crowded than DXB
- Faster check-in and security processes due to lower passenger volumes
- Often cheaper fares, since it is the base for budget and charter carriers
- Ample, easily accessible parking directly at the terminal
- Straightforward road access via three major highways
Disadvantages:
- Fewer airlines and route options than DXB
- Greater distance from central Dubai hotels and attractions
- Limited public transport connectivity until planned metro and rail upgrades are complete
- Fewer dining, shopping, and lounge options compared with DXB’s three terminals
- Ongoing construction activity nearby as the expansion progresses
Common Mistakes Travellers Make Regarding DWC
- Booking a hotel based on “Dubai Airport” without checking which one. Always confirm whether your flight lands at DXB or DWC before choosing accommodation, since the two airports are roughly 45–70 km apart.
- Assuming Emirates flies from DWC today. Emirates continues to operate from DXB; only a limited number of budget, charter, and cargo operations currently use DWC.
- Relying solely on public transport without checking journey times. Given the current metro gap, travellers should budget significantly more time for bus or taxi connections than they would from DXB.
- Expecting DXB to close soon. DXB will remain Dubai’s primary airport for years; the transition to DWC is a long-term, multi-phase process tied to the 2032 Phase 1 opening and beyond.
Future Outlook
Al Maktoum International Airport represents one of the most ambitious infrastructure undertakings in global aviation. With construction milestones being met, major contracts being awarded through 2026, and Emirates committing billions of dollars to the project, Dubai appears firmly committed to delivering a facility built for a quarter of a billion annual passengers.
For now, the practical takeaway for travellers, investors, and Dubai residents is this: DWC in 2026 remains a smaller, quieter, budget-and-cargo-focused airport, while the groundwork for its transformation into the world’s largest aviation hub is actively under construction, with Phase 1 targeted for 2032.
FAQs
1. What is Al Maktoum International Airport?
It is Dubai’s second airport, located in Dubai South near Jebel Ali. Also called Dubai World Central (DWC), it currently serves budget airlines, charter flights, and Emirates SkyCargo, while undergoing a major expansion to become Dubai’s primary hub.
2. What is the IATA code for Al Maktoum International Airport?
The airport’s IATA code is DWC, and its ICAO code is OMDW.
3. How far is Al Maktoum International Airport from Downtown Dubai?
It is approximately 40–50 kilometres from Downtown Dubai and the Burj Khalifa, roughly a 35–45 minute drive depending on traffic.
4. When will Al Maktoum International Airport open fully?
Phase 1 of the expanded airport is officially scheduled to begin operations in 2032. Full build-out to five runways and 260 million passengers annually does not yet have a confirmed date.
5. Will Emirates move to Al Maktoum International Airport?
Yes. Dubai’s leadership has confirmed that Emirates and flydubai operations are expected to eventually transfer to DWC once its new facilities are complete, with Emirates committing $10–12 billion to the project.
6. What airlines currently fly from DWC?
Current operators include Wizz Air, seasonal flydubai routes, and several European and Russian charter carriers such as Aeroflot, SmartWings, Norwegian Air Sweden, and Ural Airlines, alongside cargo operations from Emirates SkyCargo.
7. Is Al Maktoum International Airport the same as DXB?
No. DXB (Dubai International Airport) is Dubai’s current primary hub near central Dubai, while DWC is the secondary airport in Dubai South. They will eventually merge into a single hub at the DWC site.
8. How much is the Al Maktoum Airport expansion costing?
The new passenger terminal project approved in April 2024 carries a total cost of $35 billion (AED 128 billion).
9. How big will Al Maktoum International Airport be when finished?
At full capacity, it is planned to handle more than 260 million passengers and 12 million tonnes of cargo annually, with five parallel runways, two terminals, seven concourses, and 430 aircraft stands.
10. How do I get to DWC without a car?
The nearest metro station is Ibn Battuta Mall on the Red Line, connected to the airport by RTA bus and taxi services. A dedicated metro extension to the new West Terminal is currently in the design phase.
11. Does DWC have lounges and duty-free shopping?
Yes, on a smaller scale than DXB. The current terminal includes a Marhaba lounge for Priority Pass holders, a Dubai Duty Free store, and a limited selection of dining and retail outlets.
12. Why is Dubai building a new airport instead of expanding DXB?
DXB is located in a built-up urban area with limited room for physical expansion, while Dubai South offers the land needed to build a five-runway facility capable of handling more than double DXB’s eventual capacity.
Conclusion
Al Maktoum International Airport is Dubai’s clearest statement of intent about the future of global aviation: a single, purpose-built mega-hub designed to eventually replace DXB entirely. In 2026, it remains a smaller, budget-and-cargo-oriented airport, but the $35 billion expansion now under construction – backed by billions in Emirates investment and confirmed government timelines – is steadily turning DWC into what officials describe as the largest airport in the world, with Phase 1 targeted for 2032. For travellers, investors, and anyone following Dubai’s infrastructure story, DWC is a project worth watching closely over the next decade.

Shahzeen Usman is a full-time content writer based in the UAE, with over 5 years of local experience covering travel, lifestyle, and destination-focused stories. She specializes in creating engaging, research-driven content that highlights hidden gems, cultural insights, and travel trends across the Emirates and beyond.